Skip to content
HelpFree

Reset Reordering (New Build)

A short video walkthrough of reset Reordering (New Build) from the TeamBuildr knowledge base.

Watch or read

4 minutes across 3 chapters. Click any chapter or timestamp to jump straight there.

3 chapters

We'll be going over the reset ordering feature inside the new build feature previously workout scrambling was an issue with copying and pasting into different areas on top of each other and then creating a mismatched workout as you can see i have two days of workouts planned here on this sub calendar and as you can see up top here i have the parent calendar and it shows that i'm actually on the sub right now going over these calendar icons right if i hover over this b block on the 7th it shows that this is from the parent calendar so that p means that it's from the parent calendar so it's being essentially trickled down from parent to the sub calendar on the 7th and this is that b block now if i go over here there's no icons this means that this item originated.

On the sub calendar so it was programmed by me going to the sub calendar adding these extra sizes in and now i have the a block and i have this b block so what i would want to do now is i'm going to go to the parent calendar and i'm going to go to the 7th i can pull this up and i'm going to copy this over to the sub calendar so what i'm going to do is hit the copy workout i'm going to use a single date i want to copy the 7th to the 8th on that sub calendar so i would simply go to that sub calendar i'm going to check this off and i'm going to go to next i'm going to bring it over to the 8th.

Still stuck? Contact support →

Format
Walkthrough
Brand
TeamBuildr Strength
Category
BUILD